PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed ductwork hangers at the 4th floor Facing  North.jpg Installed ductwork hangers at the 4th floor Facing  West.jpg Installed sprinkler heads at the 1st floor Facing West.jpg Installed sprinkler main raiser at the 2nd floor Facing West.jpg Installed storm piping for the low roof Facing West.jpg
Previous page Installed storm piping for the low roof Facing West
Installed storm piping for the low roof Facing West